ANALISIS NILAI HASIL TERHADAP WAKTU PADA PROYEK KONTRUKSI (STUDI KASUS PADA PROYEK REHABILITASI IRIGASI GLAPAN TIMUR)
DOI:
https://doi.org/10.53866/jimi.v3i4.463Keywords:
Rate of Results, Time, Construction Project.Abstract
The public's need for building projects is increasing along with Indonesia's economic expansion. In order to realize building projects that can produce the best results, serious management is needed. One way of effective time management to support project implementation on schedule is through the application of the Earned Value Analysis approach. This research aims to analyze the application of Earned Value Analysis to estimate the final project completion time every week in order to find out whether it is in accordance with the initial project schedule plan. In addition, to determine the value of Earned Value Analysis in the completion and percentage of the value of construction projects in the 2022 fiscal year. This research method is descriptive qualitative using the Earned Value Analysis approach. The results showed that the difference between the estimated time from the baseline, project realization, and the planned schedule reached -36.21 and EVA analysis also showed a significant increase in the percentage of completion of each job each month, compared to the planned schedule.
Keywords: Rate of Results, Time, Construction Project
References
Kartikasari, A. (2012). Analisis Nilai Hasil Terhadap Waktu pada Proyek Konstruksi (Studi Kasus pada Proyek Pembangunan Gedung Perkuliahan Fisipol Universitas Gadjah mada Yogyakarta).
Kartikasari, A. (2012). Analisis Nilai Hasil Terhadap Waktu pada Proyek Konstruksi (Studi Kasus pada Proyek Pembangunan Gedung Perkuliahan Fisipol Universitas Gadjah mada Yogyakarta). Skripsi: Universitas Sebelas Maret.
Prastyono, Hendra G. (2010). Earned Value Analysis Terhadap Waktu Pada Proyek Pembangunan Gedung (Studi Kasus Proyek Pembangunan Gedung C Fakultas MIPA UNS). Skripsi: Universitas Sebelas Maret.
Ratih, S. Y., & Irnawan, D. (2020). Analisis Proyeksi Jadwal Dan Biaya Akhir Dengan Konsep Nilai Hasil Pada Proyek Konstruksi. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 3(2), 97-106.
Sudarsana, Dewa K. (2008). Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi. Jurnal Ilmiah, Universitas Udayana. 12(2), 117-125.
Soemardi, B. W., Wirahadikusumah, R. D., Abduh, M., & Pujoartanto, N. (2006). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Institut Teknologi Bandung.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Widam Rafilah, Agung Sutarto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.